Case Study: Paint Manufacturing Plant

Site Location and Description

Paint Manufacturing Plant. Water Flooding within Multi-Chemical Underground Storage Tank Farm

Key Project Elements

Litigation resulted based on the malfunctioning of a multi-million dollar automated underground storage tank farm, as the result of surface water infiltration into the electronics of the system. The multi-compartment tanks were used to storage a wide variety of chemicals to manufacture paints.

While some water infiltrations was attributed to poor installation practices for the electronic monitors, E&LP provided expert testimony and prepared expert reports to demonstrate that a third party not involved in the litigation incorrectly installed the site pavement, resulting in an inundation of surface water during precipitation events within the tank farm. The drainage issues were rectified, and the litigation was successfully settled out of court.